Operational Readiness

ARIA does not ship "when it works." It ships when it survives.

All readiness levels are backed by live stress test data and repeatable runs.

Certification Ladder

Every ARIA release passes through a strict certification ladder before it is considered deployment-ready. No exceptions.

PASSED

Level 1: Unit Validation

All components pass isolated unit tests with full coverage of critical paths.

PASSED

Level 2: Integration Verified

Full stack integration tests across kernel, memory, agents, and orchestration.

PASSED

Level 3: Adversarial Stress

Chaos injection, mixed-load scenarios, and extended duration runs with no safeties.

PASSED

Level 4: Recovery Verified

System recovers from simulated failures, restarts, and degraded conditions.

PASSED

Level 5: Field Ready

Production-equivalent load sustained for 72+ hours with zero critical faults.

Current Status: All certification levels passed. ARIA is field-ready.

System Status Overview
All Systems Operational
READY
Context Kernel v3
READY
Memory Bus
READY
Agent Orchestration
READY
Recovery System

System Dashboard

Real-time monitoring interface showing system health, agent status, and resource utilization.

ARIA System Dashboard

Primary system dashboard showing real-time metrics and agent status

Performance Metrics

Key performance indicators from production deployments and stress testing.

P50 Response Latency
23ms
P95 Response Latency
47ms
P99 Response Latency
89ms
Memory Utilization
42%
Metric Target Current Trend Status
Endpoint Coverage 100% 705/705 Stable PASS
System Uptime 99.9% 99.97% +0.02% PASS
RPS Capacity 2,000 2,847 +12% PASS
Error Rate <0.1% 0.03% -0.01% PASS
Recovery Time <5s 1.8s -0.3s PASS
Memory Stability 99% 99.8% Stable PASS

Health Monitoring Console

Continuous health monitoring with automatic anomaly detection and alerting.

Health Monitoring Console

System health console showing component status and metrics

100ms Polling

Health checks run every 100ms to detect anomalies before they cascade.

ML Anomaly Detection

Machine learning models identify subtle patterns that threshold-based monitoring misses.

Causal Tracing

Automatic root cause analysis identifies the source of failures in complex systems.

Stress Test Summary

Summary of validation testing across all system components.

705+
Endpoints Tested
47
Test Scenarios
100%
Pass Rate
72hrs
Continuous Load
Test Category Scenarios Pass Fail Coverage
Kernel Stability 12 12 0 100%
Memory Bus Throughput 8 8 0 100%
Agent Lifecycle 10 10 0 100%
Recovery Procedures 7 7 0 100%
Chaos Engineering 5 5 0 100%
Load Testing 5 5 0 100%

Deployment Readiness Checklist

Pre-deployment verification status for production environments.

Category Requirement Status
Core System Kernel initialization verified COMPLETE
Memory bus stress tested COMPLETE
Agent lifecycle validated COMPLETE
Recovery procedures tested COMPLETE
Hardware Apple MLX optimization COMPLETE
NVIDIA CUDA/TensorRT COMPLETE
CPU fallback tested COMPLETE
Security Pre-LLM compliance layer COMPLETE
Audit logging enabled COMPLETE
Data isolation verified COMPLETE
Documentation API documentation COMPLETE
Deployment guides COMPLETE

Ready for Deployment

ARIA is production-ready. Contact us to discuss your deployment requirements.

Government or defense inquiries? SDVOSB certification pending. Get in touch.